Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13683714
- Product Categories
- Friendly Links
Information Name: | Zhoushan plastic runway construction |
Published: | 2015-03-28 |
Validity: | 180 |
Specifications: | |
Quantity: | 1000000.00 |
Price Description: | |
Detailed Product Description: | Breathable plastic track description breathable plastic runway profile breathable plastic track is advanced technology from abroad, through professional digestion, has become China's large, primary and secondary schools of the most popular track and field stadium, according to incomplete statistics, breathable plastic runway occupies 63% in the proportion of large plastic pavement, primary and secondary schools. Breathable plastic runway in the United States, Germany, Italy, Japan, Korea, France, Australia and other countries are widely used. Its characteristics are: one, not bubbling: its bottom is a single-component PU with elastic rubber particles combine to environmentally friendly products, with ventilation function. At high temperatures, the steam produced by the foundation, will soon dissipate. Unable to gather steam pressure, so it will not produce bubbling and meet professional requirements, good elasticity. 1, the surface layer using EPDM (ethylene propylene diene monomer) rubber, so that it has a high degree of UV resistance, proven, no fade, strong wear resistance. 2, can not afford grain, EPDM surface layer (EPDM) rubber with polyurethane slurry, prepolymer after mixing with mechanical spraying construction. 3, excellent weather resistance, aging. 4, elastic stability, elasticity undifferentiated year, hard winter and summer is never soft. 5, the power swing and shock-absorbing ability, emphasizing athlete comfort and safety, helping athletes to play or improve performance. 6, emphasizing the overall performance of the runway, the game adaptation projects and long-term training. 7, easy to draw the line paint, bright color, do not fade, wear better. 8, flatness reach the IAAF standard treatment is good, the rain days without stopping the game, you can match immediately after heavy rain, there will be no water phenomenon. Second, the amazing duration: 400m runway plastic surface construction time is 22 days valid. Breathable plastic runway I am using the complete set of professional plastic runway construction equipment, fully mechanized construction, in order to fulfill the guarantee period. Breathable plastic runway of sports venues, beautiful color, site clean and easy to maintain and manage the impact from climate and other conditions. Breathable plastic track process: cement concrete or asphalt concrete pavement → dilute acidic water wash to clean cement concrete or asphalt concrete pavement → clean water cement concrete or asphalt concrete pavement → measure again, draw the bottom line → PU glue or cement concrete smear → laying asphalt concrete pavement, paving screed paver track → → EPDM black rubber bottom plastic surface spray painting measuring gauge line → → clean surface. Breathable plastic runway is currently no national standards, provided by the user and data on the physical and mechanical properties of the relevant inspection department is to perform reference corporate standards. Inspection and acceptance in the relevant state departments, the reference to the IAAF standards for acceptance. Breathable plastic runway Scope: primary and secondary schools throughout the country, the climatic conditions of the region in more than -16 degrees, do not use the cold snow and ice areas. Sports Facilities Engineering Co., Ltd., Ningbo students www.nbsyty.com Address: Ningbo Jiangbei District, 296 East Road double Tel: 0574-87031217 Contact: Mr. Yang 13,396,688,919 |
Admin>>>
You are the 10082 visitor
Copyright © GuangDong ICP No. 10089450, Sports Facilities Engineering Co., Ltd., Ningbo students All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 10082 visitor
Copyright © GuangDong ICP No. 10089450, Sports Facilities Engineering Co., Ltd., Ningbo students All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility